This document describes HydrOffice QC Tools 4.9.9.

2.4.3.2. How Does It Work?

The tool evaluates alignment with the Delivery Structure as specified in the selected version of HSSD.

Note

Note that because the delivery structure described in the HSSD is encouraged - but not required - for ESD projects, all resulting flags are presented as warnings (if errors for ISD) and informational messages (if warnings for ISD).

Per the Parameters set, the folder structure will be scanned based on the checks listed in Table 2.3.

Table 2.3 List of Current Checks (abbreviations in use: E = Error, W = Warning, I = Info)

Check

Profile

ISD

ESD

Valid project/survey names [1], [2]

E

At least 1 valid survey folder [3]

E

E

Extraneous files in project folder [4]

W/I

I

Extraneous folders in project folder [5]

E/W [6]

W/I [7]

| Overall structure |

Extraneous files in survey folder [4]

W/I

I

Extraneous folders in survey folder [8]

E/W [6]

W/I [7]

Presence of Metadata/Raw/Processed folders

E/W [6]

W/I [7]

| Metadata folder |

Presence of sub-folders

I

I

Presence of empty sub-folders

I

I

Expected files in sub-folders

E/W

Extraneous files in Metadata folder [9]

W/I

I

Extraneous folders in Metadata folder

E/W [6]

W/I [7]

| Raw folder |

Presence of sub-folders [10]

I

I

Presence of empty sub-folders

I

I

Expected files in sub-folders

E/W

Extraneous files in Raw folder [9]

W/I

I

Extraneous folders in Raw folder

E/W [6]

W/I [7]

| Processed folder |

Presence of sub-folders

I

I

Presence of empty sub-folders

I

I

Expected files in sub-folders

E/W

Extraneous files in Processed folder [9]

W/I

I

| File length |

Paths < 240 characters [11]

W

I

| File validity |

Files are not corrupted [12], [13], [14]

W

I